Research Article
Numerical Simulation of Flood Control Levee Deformation by Shield Tunnel Excavation through the Liuyang River: A Case Study
Figure 1
Aerial view of the subway line (the blue line is the conventional subway line, and the red line is the subway line crossing the flood control levee and Liuyang River).