Research Article

Numerical Simulation of Flood Control Levee Deformation by Shield Tunnel Excavation through the Liuyang River: A Case Study

Table 2

Material parameter setting table.

Parameter name1-11-21-61-71-81-112-12-67-2

ρ(kg/m3)201017002100202020302180197020702430
(Pa)
0.30.350.350.370.380.250.260.240.3
0.20.20.10.10.020.30.10.150.2
(m2)
(Pa)
φ(°)241015212425182830