Research Article

Tradeoff Study between Cost and Environmental Impact of Aircraft Using Simultaneous Optimization of Airframe and Engine Cycle

Table 1

Results of DOC components for baseline aircraft.

ComponentCosts
(RMB/PAX/km)
Fraction of
total DOC (%)

Depreciation0.06122819.53
Interest0.0198456.33
Insurance0.0114433.65
Crew0.0113803.63
Fuel0.11628037.09
Maintenance0.05542817.68
Airport fees0.03298110.52
Navigation fees0.0049221.57

DOC0.31351100