Research Article

Laboratory Assessment of Select Methods of Corrosion Control and Repair in Reinforced Concrete Bridges

Table 8

Half-cell potential readings after 3 months.

Specimen
number
Future treatmentAverageStd Dev.
(mV)(mV)

17 and 18Control−541.127.9
19 and 20TSZ w/EP-C−540.627.3
21 and 22TSZ−532.728.1
23 and 24EA-A−542.922.7
25 and 26EA-A w/ A-C−554.224.9
27 and 28EA-B−556.832.3
29 and 30EM−554.318.2