Research Article
Laboratory Assessment of Select Methods of Corrosion Control and Repair in Reinforced Concrete Bridges
Table 9
Condition summary of CoC specimens after 6 months of exposure.
|
Specimen number | Treatment | 6-month CoC ratings |
Total (out of 16) | Steel loss (out of 4) | Patch chloride content (out of 4) | Rebar corrosion and staining (out of 8) |
| 17 and 18 | Control | 2.80 | 2.80 | 3.50 | 9.10 | 19 and 20 | TSZ w/EP-C | 1.25 | 0.90 | 3.50 | 5.65 | 21 and 22 | TSZ | 1.10 | 0.35 | 3.50 | 4.95 | 23 and 24 | EA-A | 2.90 | 0.90 | 4.50 | 8.30 | 25 and 26 | EA-A w/A-C | 0.35 | 0.40 | 3.67 | 4.42 | 27 and 28 | EA-B | 2.10 | 1.95 | 5.33 | 9.38 | 29 and 30 | EM | 3.75 | —* | 6.17 | —* |
|
|
Patch chloride content did not conform to Fick’s 2nd Law.
|