Research Article
Test Conditions for Pipeline Materials Selection with High Pressure Sour Gas
Table 2
Operating conditions simulating reinjection in well.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
() AYS of T95 and F22 with no NaCl solution where both are 90%. |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
() AYS of T95 and F22 with no NaCl solution where both are 90%. |