Research Article

Productivity and Cost of Integrated Harvesting of Wood Chips and Sawlogs in Stand Conversion Operations

Table 3

Harvesting system productivity and costs in the integrated harvesting system.

ProcessCycle timeProduction rateMachine rateJoint products cost ($/BDTa)
(minutes)(BDTa/PMHb)($/PMHb)c(sawlogs)(biomass)

Felling/bunching0.5244.69188.240.843.37
Shoveling0.6299.13176.470.361.42
Loading8.0873.42176.470.481.92
Hauling32.5036.51211.761.164.64
Unloading3.46171.36130.620.150.61
Sorting0.6671.29138.360.391.55
Chipping0.4447.18468.780.009.94
Loading (biomass)5.84132.36121.480.000.92
Loading (sawlogs)9.22147.67130.620.880.00
Hauling (biomass)43.8735.26193.960.005.50

Total1936.764.2629.87

aBDT: bone dry metric ton.
bPMH: productive machine hours.
c$/PMH: machine rates were calculated using the assumptions of 33% fringe benefits, 10% interest, and 2% insurance.