Research Article

Detection of Leakage Areas in an Earth Embankment from GPR Measurements and Permeability Logging

Figure 9

Scheme of the Perméafor test procedure. 1: water tank, 2: pump, 3: flow meter, 4: pressure sensor, 5: data logger, 6: patented Perméafor tip, 7: displacement transducer, 8: geotechnical drill device, 9: casing connector, and 10: conventional casing. is the diameter of the screened tip (50 mm) and is its length (50 mm).