Research Article
Risk-Adjusted Control Charts for Health Care Monitoring
(1) Before the monitoring phase starts, take the following preliminary steps: | (a) Select a desired and a degree of change during that | should be optimally protected against. | (b) Apply rule of thumb (2.2) to obtain (typically truncate at 5 in practice). | (c) Find such that , where is Poission, or simply use its | approximation from (A.2). | (d) Wait till failures have occurred. Take for example, (or use Section 4 | (e.g., see (D.6)) to make a more elaborate choice). | (e) From this Phase I sample, evaluate the fraction of failures for each of the | categories . | (2) Now wait till , the moment at which the failure occurs. | (3) Obtain the corresponding numbers from category (i.e., ). | (4) Give a signal if ; otherwise go back to Step 2, leading to . |
|