Research Article

Energy Storage Requirements for PV Power Ramp Rate Control in Northern Europe

Figure 6

(a) 0.55 MWp PV generator and grid feed-in power and (b) the ESS energy during the formation of the minimum ESS energy with respect to the reference level causing the maximum absolute ESS capacity requirement of the TUT simulations on 09.04.2012 while complying with RR limit of 3%/min.
(a)
(b)