Research Article

Evaluation of Energy Production and Energy Yield Assessment Based on Feasibility, Design, and Execution of 3 × 50 MW Grid-Connected Solar PV Pilot Project in Nooriabad

Table 12

Breakdown eBOP’s list of 3 × 50 MW solar project.

NumberMaterialsSpecs & typeUnitQuantityRemarks

1Modules300 WpEach50001Ploy crystal
2Mount structuresSteel structure, 150 MWpSet13360Fixed, 28°
3Combiner box16 to 1Each150015 A fuse isolating
4Integrative inverter500 kW ACSet300Isolating transformer excluded
522 kV box-type transformerS11-1000/500/5000 kVA 22 ± 2 × 2.5%/0.315/0.315 kVEach150
6Arc suppression earthing transformer400 kVA/22 kV/0.4 kV, arc suppression coil 1200 kVAEach6Dry type
7SVG22 kV, −10 ~ +10 MVarEach6Step-down type
8SwitchgearIr = 1250, 2500 A, Ib = 31.5 kA (4 s), (3 s)Each40
9220 kV main transformerSFZ11-50000/220, 220 ± 8 × 1.25%/22 kVSet6220 kV main transformer
10220 kV main transformer spacing intervalOutgoing line spacing interval and PT2
11Breakertype: LW36-220, breaker, Ie = 2000 A, Ib = 50 kA6//
12Double earthing isolatortype:GW4-220D(W) (double), 1250 A-125 kA6//
13Current transformer10P40/10P40/10P40/10P40/0.5S/0.2S, 2 × 600/5 A36//
14Single earthing isolatorGW4-220D (W) (single), 2000 A-125 kA6//
15Secondary equipment line protection and surveillanceItem1
16Civil engineering buildingSupport equipment foundation, the fittestItem1
17CableAC/DC type, fiber opticSet1Roll bundle double 100
18Monitoring systemSCADA/PLCsSet1Mbps industrial Ethernet network structure
19SubstationAIS (air-insulated switchgear)Set1220 kV line grid POI