Research Article

Evaluation of Energy Production and Energy Yield Assessment Based on Feasibility, Design, and Execution of 3 × 50 MW Grid-Connected Solar PV Pilot Project in Nooriabad

Table 2

Monthly values of Meteonorm 7.1 [2001–2010] sat = 56% database.

MonthGlobal irrad. [kWh/m2·mth]Diffuse [kWh/m2·mth]Temper. [°C]Wind vel. [m/s]

January126.544.117.82.09
February128.057.921.02.39
March170.378.426.02.60
April182.088.829.53.30
May198.598.432.54.40
June198.197.832.64.80
July168.8100.831.74.90
August160.797.730.44.49
September169.281.029.83.90
October159.263.428.82.31
November130.945.423.71.70
December112.147.619.22.00
Year1904.3895.326.93.2