Research Article

Renewable Generation (Wind/Solar) and Load Modeling through Modified Fuzzy Prediction Interval

Table 3

Comparison of prediction interval forecast for demand power.

ModelOne step aheadOne day aheadTrain time (s)
RMSE (kW)MAE (kW)RMSE (kW)MAE (kW)

FR20.6718.2823.3814.8620.22
CA31.1126.2751.1634.59112.9
FF16.2514.1022.8115.19309.8
GA18.917.0922.4714.9153.7
PSO5.8546.721.8314.58115.3