Research Article
Grid-Connected Semitransparent Building-Integrated Photovoltaic System: The Comprehensive Case Study of the 120 kWp Plant in Kunming, China
Figure 7
(a) The average operating temperature of PV modules and (b) the air temperature in the gap between the PV curtain wall and the exterior wall of the building.
(a) |
(b) |