Research Article

Uncertainty Analysis of Energy Production for a 3 × 50 MW AC Photovoltaic Project Based on Solar Resources

Table 5

Monthly values of GHI and temperature from Meteonorm from the project site.

LocationProject site
GHI (kWh/m2) (interpolated)Temperature (°C) (interpolated)

Period1986-20052000-2009
 Jan12818.2
 Feb13021.4
 Mar16426.0
 Apr17729.6
 May18931.9
 Jun18332.5
 Jul16131.1
 Aug16229.9
 Sep17729.9
 Oct15828.7
 Nov12924.2
 Dec11519.6
Total187326.9