Research Article
Uncertainty Analysis of Energy Production for a 3 × 50 MW AC Photovoltaic Project Based on Solar Resources
Table 5
Monthly values of GHI and temperature from Meteonorm from the project site.
| Location | Project site | GHI (kWh/m2) (interpolated) | Temperature (°C) (interpolated) |
| Period | 1986-2005 | 2000-2009 | Jan | 128 | 18.2 | Feb | 130 | 21.4 | Mar | 164 | 26.0 | Apr | 177 | 29.6 | May | 189 | 31.9 | Jun | 183 | 32.5 | Jul | 161 | 31.1 | Aug | 162 | 29.9 | Sep | 177 | 29.9 | Oct | 158 | 28.7 | Nov | 129 | 24.2 | Dec | 115 | 19.6 | Total | 1873 | 26.9 |
|
|