Research Article

Uncertainty Analysis of Energy Production for a 3 × 50 MW AC Photovoltaic Project Based on Solar Resources

Table 6

Monthly values of GHI and temperature from the Meteonorm from the nearest weather station.

LocationNearest weather station
GHI (kWh/m2) (interpolated)Temperature (°C) (interpolated)

Period1986-20052000-2009
 Jan12619.5
 Feb12722.4
 Mar16426.4
 Apr18429.4
 May19230.8
 Jun18131.5
 Jul14830.2
 Aug14829.1
 Sep16829.3
 Oct16029.0
 Nov12525.2
 Dec11220.9
Total183527.0