Research Article

Uncertainty Analysis of Energy Production for a 3 × 50 MW AC Photovoltaic Project Based on Solar Resources

Table 8

Energy assessment results through simulation.

SoftwarePVSYST V6.47

Project3 × 50 MW solar PV power project
Aggregate power50 MW (1 × 50 MW)
Data sourcesMeteonorm 7.1 [2001-2010]
Land coordinatesLongitude 68°4.2, north latitude 25°19.2, altitude 70 m
Legal timeTime zone TU + 5
Mounting structureFixed tile

PV system grid-connectedPV field orientationPV modulesPV arrayInverterUser’s needs
Tilt 20°, azimuth 0°Model JKM300P-72
Jinko Solar
No. of module 166680Model TC 1000KSUnlimited load (grid)
PnomPnom totalPnom
300 Wp50004 kWp1000 kW AC
Inverter packNo. of units: 50.0, Pnom total: 50000 kW AC
PV modules8334 strings of 20 modules in series, 50004 kWp total
Area323069 m2
Production80085 MWh/year
PR77.62% (performance ratio)
No shading field defined