Research Article

Uncertainty Analysis of Energy Production for a 3 × 50 MW AC Photovoltaic Project Based on Solar Resources

Table 9

The above sources assessed for the project and are presented in the table.

Source of uncertainty in the simulationEstimated uncertainty standard deviation

Irradiation on the tilted plane3.0%
Shading/soiling/snow2.5%
Reflection and spectral losses1.5%
Deviation from STC4.0%
Module power tolerance2.0%
Module mismatch1.0%
Cabling losses0.8%
MPPT tracking0.5%
Inverter losses1.5%
Total6.4%