Table 1

Financial parameters for PV and CSP plants [32].

ParameterValueUnit

PV cost
 Solar modules0.45$/W
 Inverters0.13$/W
 Labour cost0.15$/W
 Balance of system equipment0.10$/W
 Installer margin and overhead0.22$/W
 Annual operational and maintenance cost10$/kW/year
 Real interest rate5%
 Degradation factor1%/year
 Lifetime25Years
CSP cost
 Solar field120$/m2
 Heat transfer fluid50$/m2
 Power bloc1050$/kWhel
 Thermal energy storage system60$/kWhth
 EPC and owner cost11%
 Balance of plant110$/kWhel
 Contingency2$/kWhel
 O&M cost20$/MWhel
 Real interest rate5%
 Degradation rate0.2%/year
 Lifetime25Years