Modelling and Assessing the Performance of Hybrid PV-CSP Plants in Morocco: A Parametric Study
Table 1
Financial parameters for PV and CSP plants [
32].
| Parameter | Value | Unit |
| PV cost | | | Solar modules | 0.45 | $/W | Inverters | 0.13 | $/W | Labour cost | 0.15 | $/W | Balance of system equipment | 0.10 | $/W | Installer margin and overhead | 0.22 | $/W | Annual operational and maintenance cost | 10 | $/kW/year | Real interest rate | 5 | % | Degradation factor | 1 | %/year | Lifetime | 25 | Years | CSP cost | | | Solar field | 120 | $/m2 | Heat transfer fluid | 50 | $/m2 | Power bloc | 1050 | $/kWhel | Thermal energy storage system | 60 | $/kWhth | EPC and owner cost | 11 | % | Balance of plant | 110 | $/kWhel | Contingency | 2 | $/kWhel | O&M cost | 20 | $/MWhel | Real interest rate | 5 | % | Degradation rate | 0.2 | %/year | Lifetime | 25 | Years |
|
|