Modelling and Assessing the Performance of Hybrid PV-CSP Plants in Morocco: A Parametric Study
Table 4
Summarization of optimal results of each simulation.
| Capacity installed: 150 MW |
| SM | 1 | 1.5 | 2 | 2.5 | 3 | 3.5 | 4 | TES | 0 | [1, 4] | [2, 6] | [5, 9] | [7, 12] | [13, 16] | [15, 17] | Annual energy (GWh) | 255 | [378.8, 392.3] | [490, 520] | [592, 640] | [691, 762] | [858, 885] | [960, 973] | LCOE ($/kWh) | 0.09 | [0.08, 0.092] | [0.077, 0.082] | [0.078, 0.083] | [0.079, 0.083] | [0.081, 0.085] | [0.081, 0.083] |
|
|