Research Article
Dual-Mode Photovoltaic Bidirectional Inverter Operation for Seamless Power Transfer to DC and AC Loads with the Grid Interface
Table 7
Experimentally measured power, voltage, current, and power factor values at different instants.
| Time | PV generation (W) | DC load (W) | AC load (W) | Line voltage (V) | Line current (A) | Power (kW) | Power factor |
| 6 AM | 0 | 800 | 100 | 308.2 | 1.880 | 0.950 | 0.99 | 10 AM | 330 | 800 | 100 | 315.9 | 1.363 | 0.650 | 0.99 | 11 AM | 900 | 800 | 100 | 310.3 | 0.522 | 0.091 | 1 | 12.:40 PM | 1500 | 800 | 100 | 312.2 | 0.970 | -0.507 | -0.96 |
|
|