Results of optimization analysis of the HES in each island.

ParameterUnitLarak IslandFailaka IslandLavan Island
CCLFCCLFCCLF

ComponentDGSize (kW)150150150150150150
Fuel use (L/year)90,66118,22339,5446,74581,03719,159
PV systemCapacity (kW)4436685681,056349594
BatterySize (kWh)3501,2491,1451,424316918
Autonomy (hr)2.809.889.0611.32.57.26
ConverterSize (kW)280274306323287300
HKTQuantity (no.)222222
Activity (h/year)2,9282,9284,3924,3924,3924,392
WTQuantity (no.)111111
Activity (h/year)6,5596,5596,1606,1606,5046,504
GenerationRF(%)63.993.684.297.767.893.6
Excess electricityMWh/yr205.8331.3253.397967.893.6
Capacity shortagekWh/yr878701445866855853
Total energy generationMWh/yr1,1481,2851,2081,9321.0891,280
Unmet loadkWh/yr13631.27.82427.5213.9