Research Article

Proposition of Thin-Layer Repairing Methods Using Low-Elasticity Polymer Portland Cement Materials and Glue and Study on the Fatigue Resistance of Reinforced Concrete Slab

Table 6

The number of equivalent cycles and the reinforced equivalent running number used.

RC-U-36RC-UF-45

RC slab7,865,5987,865,598

Primary repair (wet state)Equivalent runs, number of times1,685,9743,685,775
Reinforcement effect2.2

Secondary repair (wet state)Equivalent runs, number of times1,621,1273,250,670
Reinforcement effect2.0

Tertiary repair (dry state)Equivalent runs, number of times10,493,07742,350,384
Reinforcement effect4.0

Total until tertiary repairEquivalent runs, number of times21,665,77657,152,427
Reinforcement effect2.64