Research Article
The Optimal Dispatch of Traffic and Patrol Police Service Platforms
Table 4
The optimal dispatch project of TPPSP with
= 30 min.
| Dispatching project | Path of choosing project | Time from the ith TPPSP to the jth intersection |
| 1–62 | 1-75-76-64-63-4-62 | 4.885200 | 2–16 | 2-40-39-38-16 | 7.388100 | 6–30 | 6-47-48-30 | 3.213500 | 7–29 | 7-30-29 | 8.015500 | 8–48 | 8-47-48 | 3.099500 | 9–38 | 9-35-36-39-38 | 4.725700 | 10–22 | 10-26-11-22 | 7.707900 | 11–23 | 11-22-13-23 | 4.675100 | 12–12 | 12-12 | 0.000000 | 13–24 | 13-24 | 2.385400 | 14–21 | 14-21 | 3.265000 | 15–28 | 15-28 | 4.751800 | 16–14 | 16-14 | 6.741700 |
|
|