The optimal dispatch project of TPPSP with = 60 min.

Dispatching project Path of choosing project Time from the ith TPPSP to the jth intersection

2–16 2-40-39-38-16 7.388100
4–48 4-57-58-59-51-50-5-47-48 7.395900
7–29 7-30-29 8.015500
9–30 9-34-33-32-7-30 3.492300
10–22 10-26-11-22 7.707900
11–24 11-25-24 3.805300
12–23 12-25-24-13-23 6.477000
13–12 13-24-25-12 5.977000
14–21 14-21 3.265000
15–28 15-28 4.751800
16–14 16-14 6.741700
19–38 19-79-78-1-69-70-2-40-39-38 7.639300
20–62 20-85-62 6.448900