Bending Moment Calculations for Piles Based on the Finite Element Method
Table 14
Calculated horizontal displacement of pile A.
| Item | At elevation of −5.3 m | At elevation of −90 m |
| C3D20R-M3 | Displacement (m) | 0.02024 | 0.00642 | C3D8-M1 | Displacement (m) Error (%) | 0.020093 −0.71 | 0.006339 −1.22 | C3D8-M2 | Displacement (m) Error (%) | 0.019967 −1.33 | 0.006355 −0.96 | C3D8-M3 | Displacement (m) Error (%) | 0.019897 −1.68 | 0.006368 −0.77 | C3D8-M4 | Displacement (m) Error (%) | 0.019971 −1.31 | 0.006355 −0.96 | C3D8-M5 | Displacement (m) Error (%) | 0.019967 −1.33 | 0.006355 −0.97 |
|
|