Research Article
Applying Hybrid PSO to Optimize Directional Overcurrent Relay Coordination in Variable Network Topologies
Table 8
Operation times of primary/backup relay pairs after the removal of Line 65 (near-end faults) using the proposed NM-PSO method.
| Backup relay | Primary relay | Constraint value (sec) | No. | Operating time (sec) | No. | Operating time (sec) | ā |
| 6 | 0.5452 | 1 | 0.2968 | 0.2484 | 9 | 0.7377 | 8 | 0.2034 | 0.5343 | 7 | 0.9302 | 8 | 0.2034 | 0.7267 | 1 | 2.2755 | 2 | 0.2873 | 1.9883 | 10 | 1.3815 | 9 | 0.6249 | 0.7566 | 7 | 0.9302 | 2 | 0.2873 | 0.6429 | 2 | 0.4457 | 3 | 0.2457 | 0.2000 | 14 | 0.5666 | 6 | 0.2445 | 0.3221 | 8 | 0.4834 | 13 | 0.2834 | 0.2000 | 9 | 0.7377 | 14 | 0.2140 | 0.5237 | 1 | 2.2755 | 14 | 0.2140 | 2.0616 | 13 | 1.3070 | 7 | 0.2441 | 1.0630 | 3 | 0.3261 | 4 | 0.1261 | 0.2000 |
|
|