Research Article

Applying Hybrid PSO to Optimize Directional Overcurrent Relay Coordination in Variable Network Topologies

Table 8

Operation times of primary/backup relay pairs after the removal of Line 65 (near-end faults) using the proposed NM-PSO method.

Backup relayPrimary relayConstraint value (sec)
No.Operating time (sec)No.Operating time (sec)ā€‰

60.545210.29680.2484
90.737780.20340.5343
70.930280.20340.7267
12.275520.28731.9883
101.381590.62490.7566
70.930220.28730.6429
20.445730.24570.2000
140.566660.24450.3221
80.4834130.28340.2000
90.7377140.21400.5237
12.2755140.21402.0616
131.307070.24411.0630
30.326140.12610.2000