Research Article
A Fuzzy Rule for Improving the Performance of Multiobjective Job Dispatching in a Wafer Fabrication Factory
Table 1
Some existing fuzzy dispatching rules.
| References | System type | Rules/inputs/outputs | Number of objectives |
| Xiong et al. [4] | TSK | 2/2/1 | 2 (average cycle time, lateness) | Benincasa et al. [5] | Mamdani | 27/3/1 | 2 (average cycle time, WIP level) | Lee et al. [9] | Single-rule-based | 2/4/1 | 2 (average cycle time, cycle time standard deviation) | Tan and Tang [10] | Mamdani | 8/4/1 | 3 (throughput, average cycle time, no. of vehicles) | Dong and Liu [11] | ANFIS | 16/4/1 | 1 (average cycle time) | Tsai and Chen [12] | Fusion | 4/5/1 | 4 (average cycle time, cycle time standard deviation, maximum lateness, number of tardy jobs) |
|
|
WIP: work-in progress.
|