Research Article
A Fuzzy Rule for Improving the Performance of Multiobjective Job Dispatching in a Wafer Fabrication Factory
Table 8
The performances of various approaches in the maximum lateness.
| The maximum lateness (hrs) | A (normal) | A (hot) | A (super hot) | B (normal) | B (hot) |
| FIFO | 401 | −122 | 164 | 221 | 172 | EDD | 295 | −181 | 144 | 336 | 185 | SRPT | 584 | −142 | 174 | 718 | 194 | CR | 302 | −159 | 138 | 423 | 192 | FSMCT | 875 | −165 | 125 | 856 | 171 | FSVCT | 706 | −112 | 174 | 686 | 260 | 4o-SDR | 360 | −152 | 118 | 21 | 94 | The proposed methodology | 292 | −143 | 113 | 23 | 102 |
|
|