Research Article
Impact of DG Configuration on Maximum Use of Load Supply Capability in Distribution Power Systems
Table 3
Capacities of the transformers and connection feeders.
| Connection feeder capacity MVA | Tran. 1 | Tran. 2 | Tran. 3 | Tran. 4 | Tran. 5 | Tran. 6 | 20 MVA | 20 MVA | 20 MVA | 20 MVA | 31.5 MVA | 31.5 MVA |
| Tran. 1 | | | | | | | 20 MVA | 0 | 20 | 0 | 0 | 0 | 0 | Tran. 2 | | | | | | | 20 MVA | 20 | 0 | 8 | 0 | 3 | 0 | Tran. 3 | | | | | | | 20 MVA | 0 | 8 | 0 | 20 | 5 | 3 | Tran. 4 | | | | | | | 20 MVA | 0 | 0 | 20 | 0 | 5 | 5 | Tran. 5 | | | | | | | 31.5 MVA | 0 | 3 | 5 | 5 | 0 | 31.5 | Tran. 6 | | | | | | | 31.5 MVA | 0 | 0 | 3 | 5 | 31.5 | 0 |
|
|