Research Article
Impact of DG Configuration on Maximum Use of Load Supply Capability in Distribution Power Systems
Table 5
Comparison between direct and indirect load transfer.
| LSC expectation MVA | Direct load transfer | Indirect load transfer | 90.3599 | 101.143 | Tran. | Loading factor expectation (%) | Loading factor standard deviation (%) | Loading factor expectation (%) | Loading factor standard deviation (%) |
| 1 | 55.75 | 0.97 | 69.89 | 0.31 | 2 | 47.16 | 0.84 | 63.02 | 0.39 | 3 | 77.53 | 0.18 | 69.9 | 0.30 | 4 | 72.47 | 0.18 | 75.53 | 0.38 | 5 | 64 | 6.46 | 72.18 | 0.25 | 6 | 55.75 | 0.97 | 72.18 | 0.00 |
|
|