Research Article

A Hybrid Grey Based KOHONEN Model and Biogeography-Based Optimization for Project Portfolio Selection

Table 1

A summary of the previous studies on project portfolio selection.

NumberDecision model/methodDecision problemDecision conditionsResearcher(s)

1AHP-BLPIT deployment project in TebyanNondeterministic Rahmani et al., 2012 [12]
2AHP-TOPSISLocating project of National Oil CompanyDeterministicAmiri, 2010 [13]
3AHPIndian oil pipelinesDeterministicDey, 2006 [14]
4ANP-AHPConstruction project of solar plantDeterministicAragonés-Beltrán et al., 2010 [15]
5ANP-GPInformation system development projectDeterministicWang et al., 2009 [16]
6ANPTurkey’s highway projectDeterministicDikmen et al., 2007 [17]
7GP-TOPSISIndefinite-life projectsDeterministic Khalili-Damghani and Sadi-Nezhad, 2013 [18]
8AHP-VIKORNew energy projectsDeterministicSan Cristóbal, 2011 [19]
9Fuzzy ELECTREProject portfolio selectionFuzzyDaneshvar Rouyendegh and Erol, 2012 [20]
10SIMULATION PROMETHEEProject portfolio selectionNondeterministicShakhsi-Niaei et al., 2011 [21]
11Fuzzy DEAConstruction industry portfolio projectFuzzyChang and Lee, 2012 [22]
12SDAnalysis of risk dynamics of projectDeterministicLiu and Ye, 2010 [23]
13ABSProject selection with limited resourcesDeterministicAraúzo et al., 2010 [24]
14ABSGerman energy market portfolioselectionDeterministicBiernatzki et al., 2004 [25]
15Grey Relational AnalysisInvestment project selectionDeterministicZhang, 2012 [26]
16FAHP-FTOPSISProject portfolio selectionFuzzyMohaghar et al., 2012 [27]
17PROMETHEE C-OptimalProject portfolio selectionDeterministicVetschera and de Almeida, 2012 [28]