Research Article

Modeling and Dynamical Analysis of the Water Resources Supply-Demand System: A Case Study in Haihe River Basin

Table 2

The parameters’ initial intervals and identified values. P stands for parameters, II stands for initial intervals, and IP stands for identified parameters.

P

II[0.01, 1.00][0.01, 0.20][0.02, 0.20][0.05, 0.20][0.01, 0.15][0.04, 0.15][0.05, 0.20][0.10, 0.40][0.05, 0.30][0.01, 0.10][0.01, 0.20][0.01, 0.10][0.01, 0.10][0.01, 0.10][0.10, 2.00][0.10, 2.00]
IP0.700.010.030.050.030.050.100.190.110.060.100.100.890.010.990.40