Research Article
Multitask Oriented Virtual Resource Integration and Optimal Scheduling in Cloud Manufacturing
(1) For 1 to // looped by columns | (2) For 1 to //checked by rows | (3) If , jump to Step 2; | (4) Else | If , jump to Step 2; | Else | If not existed the same non-zero number, jump to | Step 2; | Else | Randomly selected a number from the difference | set between the set and the current column | value set to replay. If the difference sets is , then | set ; | (5) For End | (6) For End |
|