Research Article

Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

Table 8

Mean and standard deviation of conditional probability distribution of total cost and duration.

Conditional distribution of total durationMean estimation
Standard deviation estimation Conditional distribution of total costMean estimation
Standard deviation estimation

73.0011.41 5450.000.00
73.066.47 5450.000.00
74.816.66 5450.000.00
F(T/7100)78.177.10F(C/71)6543.15590.41
F(T/7400)79.167.30F(C/74)6587.41596.18
F(T/7700)79.907.49F(C/77)6726.00645.77
81.127.93 6900.14705.49
83.258.24 7476.43929.64
83.288.25 7477.40929.68
83.308.26 7477.40929.68