Research Article

Optimization of High-Speed Train Control Strategy for Traction Energy Saving Using an Improved Genetic Algorithm

Table 5

Experiment confrontation with other algorithms.

ExperimentSection lengthRunning strategyTime setActual running timeEnergy consumption

Beijing-Langfang with PMPGA59.5 kmSpecified time with GA20 min 00 s20 min 00 s3247.2 kwh
Beijing-Langfang
E5
59.5 kmDifferential evolution20 min 00 s20 min 00 s3362.9 kwh
Beijing-Langfang
E6
59.5 kmFuzzy optimization20 min 00 s19 min 59 s3402.1 kwh