Research Article
Long-Term Maintenance Scheduling of Smart Distribution System through a PSO-TS Algorithm
Table 7
System cost with different reliability requirements.
| Cost | Ordinary constraints ($) (SAIFI ≤ 1.75 month−1, SAIDI ≤ 10 h·month−1) | Stricter constraints ($) (SAIFI ≤ 1.5 month−1, SAIDI ≤ 8 h·month−1) |
| Lost load penalty | 257,278.0 | 268,927.0 | Corrective maintenance | 22,495.7 | 23,531.1 | Preventive maintenance | 2,156.0 | 2,137.5 |
| Total | 281,929.7 | 294,595.6 |
|
|