Research Article

Reliability Analysis of an Extended Shock Model and Its Optimization Application in a Production Line

Table 7

Availability and average profit per unit time of production line for different time of each part-time job.

1 2 3 4 5 6 7 8 9

0.9115 0.8635 0.8103 0.7593 0.7127 0.6707 0.6330 0.5991 0.5684
1623.5 1946.6 2088.8 2153.7 2183.3 2195.7 2199.3 2198.3 2194.7