Research Article

ILS Heuristics for the Single-Machine Scheduling Problem with Sequence-Dependent Family Setup Times to Minimize Total Tardiness

Table 4

Average RDIs (%) of the heuristics on large size instances.

HGAILS_BASICILS_DPILS_DP+PR
BestWorstAvgBestWorstAvgBestWorstAvgBestWorstAvg

0.8328.3312.700.0010.321.930.0011.521.980.002.770.12
0.8340.0026.580.0014.061.910.0015.452.330.009.320.73
4.6448.3335.480.0022.433.040.0020.793.260.0017.032.23
2.8952.5038.620.0033.194.940.0030.865.730.0023.934.69
4.7933.3322.480.0021.124.400.0018.034.150.007.090.73
10.0845.0033.870.0026.615.390.0026.224.380.0017.882.78
16.3652.5043.480.0031.665.380.0030.195.320.0029.874.75
17.0354.1746.860.0038.826.740.0036.736.610.0035.657.00
14.3839.1729.030.2721.385.350.0020.553.790.0011.861.85
22.8550.8341.420.0026.337.030.0025.325.550.0024.784.51
27.4053.3345.140.0024.704.870.0023.214.010.0021.784.02
30.4159.1747.430.0032.807.010.0030.697.000.0031.276.62

Average 12.7146.3935.260.0224.954.830.0024.804.510.0019.603.34