Main phase of the GDCPP [33] | Subphase | Terms used in the GDCPP [33] | Activity themes generated from coding | Subphase of the home modification process | Main phase of the OTIPM [33] |
|
Preproject | 0 | Demonstrating the need | Demonstrate an occupational need within the person-centred performance context | 0 | Evaluation |
1 | Conception of need | Conceptualise the need as identified by the person | 1 |
2 | Outline of feasibility | Conduct an occupational performance analysis to identify the person(s) PET requirements | 2 |
|
Preproject | 3 | Substantive feasibility study | Develop collaborative goal(s) by identifying the detailed PET design requirement for the home modification | 3 | Modification planning |
4 | Outline conceptual design | Conduct substantive feasibility study for achieving the PET specification (including funding route) | 4 |
|
Preconstruction | 5 | Full conceptual design | Obtain agreement on the full detailed design of the home modifications | 5 | Modification planning |
|
Preconstruction | 6 | Coordinate design, procurement, and full financial authority | Coordinate and support procurement of the occupation-focused home modification | 6 | Modification implementation |
|
Construction | 7 | Production information | Coordinate and support procurement of the occupation-focused home modification | 6 | Modification implementation |
|
Construction | 8 | Construction | Construct the occupation-focused home modification | 7 | Modification implementation |
|
After completion | 9 | Operation and maintenance | Conduct site visit to check the operation and maintenance of the occupational-focused home modification | 8 | Reevaluation |
|