Research Article
Optimal Corridor Selection for a Road Space Management Strategy: Methodology and Tool
Table 3
Result of analysis of example network.
| Case | Link/corridor level performance measures | System level performance measures | Corridor | Corridor selection | Travel time (min) | Av. speed (mph) | Performance measure | Value [% change from base-case] |
| Optimal improvements | Loop 410 NW | No | 16 | 50 [14%] | TSTT (veh-min) | 669,742 +[15%] | Loop 410 SW | Yes | 21 | 58 [14%] | I-37/US 281 | No | 5 | 58 [12%] | TSCC () | 79,566,231 +[0.5%] | Loop 410 NE | Yes | 13 | 57 [10%] | Loop 410 SE | No | 8 | 56 [8%] | Improvement cost | 60,600 |
|
|
Solution obtained by the proposed method in this paper.
|