Research Article

Refining Lane-Based Traffic Signal Settings to Satisfy Spatial Lane Length Requirements

Table 4

Detailed traffic signal timing results for the morning peak period.

From leg
i
Lane
k
To leg j (allocated
lane flow, pcu/h)
Total lane
flow
(pcu/h)
Turning
proportion
Saturation
flow
(pcu/h)
Flow
factor
Start of green/duration of greenMaximum queue length (pcu)Simulated maximum queue length from VISSIM (pcu)
1234Refined from
Max R.C.
Refined from
Min total
delay
Refined from
Max R.C.
Refined from
Min total
delay
Refined from
Max R.C.
Refined from
Min total
delay

11180.0150.9330.90.5441886.70.17540.0/20.42.3/20.54.6834.6815.0755.030
2154.1199.0353.10.5642013.20.17544.9974.9954.9874.958

21103.0105.6208.60.4941803.70.115740.7/7.642.8/7.73.6853.6933.8664.024
2237.7237.70.0002055.00.11574.1994.2083.8054.101
333.7199.8233.50.1442018.60.11574.1254.1333.8674.028
4211.3211.31.0001826.70.11573.7333.7403.9133.983

3153.7171.0224.70.7611812.60.124054.3/10.756.5/11.23.7793.7593.8724.006
2181.373.0254.30.2872051.40.12404.2774.2543.8504.116

41203.07.6210.60.9641709.10.123226.4/8.328.8/8.03.6803.7093.9403.940
2253.2253.20.0002055.00.12324.4244.4604.7454.807
3253.2253.20.0002055.00.12324.4244.4604.8334.765
4150.0150.01.0001826.70.08212.6212.6422.9212.941

: the optimal cycle length refined from Max RC result is 71.0 s; : the optimal cycle length refined from Min total delay result is 71.4 s.