Research Article
Refining Lane-Based Traffic Signal Settings to Satisfy Spatial Lane Length Requirements
Table 8
Key signal optimization results from the multiperiod lane-based model as current model inputs.
| Leg | Lane | Morning peak | Off peak | Evening peak | Lane flow (pcu/h) | start/duration (s) | Lane flow (pcu/h) | Green start/duration (s) | Lane flow (pcu/h) | Green start/duration (s) |
| 1 | 1 | 330.9 | 0.0/31.5; 2.3/19.0 | 300.8 | 0.0/25.4; 3.3/16.0 | 271.0 | 0.0/26.1; 1.4/16.0 | 2 | 353.1 | 309.2 | 282.0 |
| 2 | 1 | 208.6 | 65.7/20.4; 49.3/15.7 | 252.0 | 60.7/22.8; 47.3/16.0 | 186.3 | 61.4/19.2; 45.4/16.0 | 2 | 237.7 | 290.8 | 218.7 | 3 | 233.5 | 286.7 | 217.7 | 4 | 211.3 | 258.5 | 194.4 |
| 3 | 1 | 224.7 | 92.1/21.9; 71.0/15.7 | 264.9 | 31.4/23.3; 25.3/16.0 | 272.3 | 86.6/27.4; 67.4/16.0 | 2 | 254.3 | 291.1 | 305.7 |
| 4 | 1 | 210.6 | 37.5/22.2; 27.3/16.0 | 267.0 | 89.6/24.4; 69.3/16.0 | 219.3 | 32.1/23.3; 23.4/16.0 | 2 | 253.2 | 310.4 | 258.4 | 3 | 253.2 | 309.7 | 258.4 | 4 | 150.0 | 275.9 | 188.0 |
| Cycle length for Max RC | 120.0 s | 120.0 s | 120.0 s |
| Cycle length for Min total delay | 90.4 s | 88.0 s | 88.0 s |
|
|
start/duration for maximizing RC; green start/duration for minimizing total delay.
|