Key signal optimization results from the multiperiod lane-based model as current model inputs.

Leg Lane Morning peak Off peak Evening peak
Lane flow (pcu/h) start/duration (s)Lane flow (pcu/h)Green start/duration (s)Lane flow (pcu/h)Green start/duration (s)

11330.90.0/31.5;
2.3/19.0
300.80.0/25.4;
3.3/16.0
271.00.0/26.1;
1.4/16.0
2353.1309.2282.0

21208.665.7/20.4;
49.3/15.7
252.060.7/22.8;
47.3/16.0
186.361.4/19.2;
45.4/16.0
2237.7290.8218.7
3233.5286.7217.7
4211.3258.5194.4

31224.792.1/21.9;
71.0/15.7
264.931.4/23.3; 25.3/16.0272.386.6/27.4;
67.4/16.0
2254.3291.1305.7

41210.637.5/22.2;
27.3/16.0
267.089.6/24.4;
69.3/16.0
219.332.1/23.3;
23.4/16.0
2253.2310.4258.4
3253.2309.7258.4
4150.0275.9188.0

Cycle length for Max RC 120.0 s 120.0 s 120.0 s

Cycle length for
Min total delay
90.4 s 88.0 s 88.0 s

start/duration for maximizing RC; green start/duration for minimizing total delay.