Research Article

Three Extensions of Tong and Richardson’s Algorithm for Finding the Optimal Path in Schedule-Based Railway Networks

Table 10

The possible path cost calculation in Example  2.

Actual valuePenaltyWeighted time

IVT-transit time1921.0192.0
IVT-waiting time on train131.013.0
Walking time02.00.0
Waiting time at platform101.818.0
Transfer01.00.0
Fare388.50.625621.6
Sum844.6