Research Article
Three Extensions of Tong and Richardson’s Algorithm for Finding the Optimal Path in Schedule-Based Railway Networks
Table 12
The possible path cost calculation for the first run.
| | Actual value | Penalty | Weighted time |
| IVT-transit time | 242 | 1.0 | 242.0 | IVT-waiting time on train | 8 | 1.0 | 8.0 | Walking time | 1 | 2.0 | 2.0 | Waiting time at platform | 14 | 1.8 | 25.2 | Waiting time at home | 0 | 0.5 | 0.0 | Travel between zones and stations | 10 | 1.0 | 10.0 | Transfer | 1 | 1.0 | 1.0 | Fare | 185.5 | 0.625 | 296.8 | Sum | | | 585.0 |
|
|