Research Article

Three Extensions of Tong and Richardson’s Algorithm for Finding the Optimal Path in Schedule-Based Railway Networks

Table 12

The possible path cost calculation for the first run.

Actual valuePenaltyWeighted time

IVT-transit time2421.0242.0
IVT-waiting time on train81.08.0
Walking time12.02.0
Waiting time at platform141.825.2
Waiting time at home00.50.0
Travel between zones and stations101.010.0
Transfer11.01.0
Fare185.50.625296.8
Sum585.0