Research Article

Three Extensions of Tong and Richardson’s Algorithm for Finding the Optimal Path in Schedule-Based Railway Networks

Table 4

Cost calculation for the possible path for a trip from Guangzhou to Liuzhou.

Actual valuePenaltyWeighted time

IVT-transit time3231.0323.0
IVT-waiting time on train21.02.0
Walking time12.02.0
Waiting time at platform31.85.4
Transfer11.01.0
Fare186.00.625297.6
Sum631.0