Research Article
A Simheuristic Method for the Reversible Lanes Allocation and Scheduling Problem at Smart Container Terminal Gate
Table 2
Cost coefficients of lanes at container gates.
| Parameters | Symbols | Units | Values |
| Depreciable costs coefficients of FLs in enter direction | | CNY/hour | 8.00 | Depreciable costs coefficients of FLs in departure direction | | CNY/hour | 7.00 | Depreciable costs coefficients of RLs | | CNY/hour | 15.00 | Labor costs coefficients of lanes | , , | CNY/hour | 20.00 | Electric power cost coefficients of lanes | , , | CNY/hour | 2.00 | Waiting time cost coefficient of container trucks | | CNY/vehicle/hour | 25.00 | Fuel cost coefficient of container trucks | | CNY/vehicle/hour | 7.50 |
|
|