Transportation Planning through GIS and Multicriteria Analysis: Case Study of Beijing and XiongAn
Table 1
Characteristics of variants.
| ā | Variant | Length, km | Type of way | Time, h | Accessibility | Connection with another type of transport |
| V1 | Existing intercity railway line | 157 | railway | 3h, 30 minute- 4hour | no specific connection | Bus and Subway, Road |
| V2 | New line | 105 | Metro, railway (High-speed Line) | Should be less than 1 hour. | Metro + new railway line; connections in metro station | Subway Stations |
| V3 | Motorway-1 | 125 | Trunk road +Motorway | 1 hour, 48 minute | 6th Ring Road+ Motorway | Overall weak connection |
| V4 | Motorway-2 | 167 | Trunk road +Motorway | 2 hour 8 minute | 6th Ring Road+ Motorway | Overall weak connection |
| V5 | Motorway-3 | 160 | Trunk road +Motorway | 2 hour 24 minute | 6th Ring Road+ Motorway | Overall weak connection |
|
|