Research Article

Transportation Planning through GIS and Multicriteria Analysis: Case Study of Beijing and XiongAn

Table 1

Characteristics of variants.

ā€‰VariantLength, kmType of wayTime, hAccessibilityConnection with another type of transport

V1Existing intercity railway line157railway3h, 30 minute- 4hourno specific connectionBus and Subway, Road

V2New line105Metro, railway
(High-speed Line)
Should be less than 1 hour.Metro + new railway line; connections in metro stationSubway Stations

V3Motorway-1125Trunk road +Motorway1 hour, 48 minute6th Ring Road+ MotorwayOverall weak connection

V4Motorway-2167Trunk road +Motorway2 hour 8 minute6th Ring Road+ MotorwayOverall weak connection

V5Motorway-3160Trunk road +Motorway2 hour 24 minute6th Ring Road+ MotorwayOverall weak connection