Research Article
Time-Dependent Transportation Network Design considering Construction Impact
Table 5
Parameters for candidate projects in the Sioux Falls network.
| Link | Lane capacity | Maximum allowable capacity | Number of closed lanes | Maximum allowable shortened duration | Fixed duration | Extra duration for adding one lane |
| (1, 2) | 13.0 | 40 | 1 | 4 | 8 | 8 | (9, 8) | 3.0 | 12 | 1 | 2 | 3 | 3 | (11, 10) | 5.0 | 15 | 1 | 1 | 3 | 3 | (12, 13) | 13.0 | 50 | 1 | 2 | 4 | 4 | (14, 15) | 3.0 | 9 | 1 | 1 | 2 | 2 | (15, 19) | 8.0 | 32 | 1 | 1 | 2 | 2 | (16, 18) | 10.0 | 40 | 1 | 1 | 2 | 3 | (18, 20) | 12.0 | 36 | 1 | 2 | 4 | 4 | (23, 22) | 2.4 | 8 | 1 | 0 | 1 | 1 | (24, 21) | 2.4 | 8 | 1 | 0 | 1 | 1 |
|
|