Time-Dependent Transportation Network Design considering Construction Impact
Table 6
Selection and scheduling results for Example
.
| ā | Stating time | Ending time | Newly added lanes | Reduced construction duration |
| (9, 8) | 11 | 17 | 2 | 2 | (11, 10) | 1 | 5 | 1 | 1 | (14, 15) | 3 | 5 | 1 | 1 | (16, 18) | 17 | 20 | 1 | 1 | (23, 22) | 13 | 14 | 1 | 0 | (24, 21) | 15 | 16 | 1 | 0 |
|
|